Concurrent migration execution
By default, Vitess schedules all migrations to run sequentially. Only a single migration is expected to run at any given time. However, there are cases for concurrent execution of migrations, and the user may request concurrent execution via --allow-concurrent
flag in ddl_strategy
.
Why not run concurrent migrations by default #
At the heart of schema migration management we are interested in ALTER
DDLs that run for long periods of time. These will copy large amounts of data, perform many reads and writes, and overall affect the production server. They use built-in throttling mechanism to prevent harming production. The migration essentially competes with production traffic over resources.
Generally speaking, running multiple such migrations concurrently increases resource competition substantially, and yields with overall higher wall clock migrations runtime compared with sequential execution. However, this depends on the phases of the running migrations, as explained next.
Phases of a Vitess migration #
A vitess
ALTER TABLE
migration runs through several phases, and the two notable ones are:
- The copy phase
- The tailing phase
While the two interleave to some extent, it is illustrative to think of a migration as first copying the already existing rows of a table into the shadow table, then proceeding to tail the changelog (the binary logs) and apply events onto the shadow table.
The copy phase is generally a heavyweight operation, as it incurs a massive copy of data in a greedy (though throttled) approach. The tailing phase could be intensive or relaxed, depending on the incoming production traffic (INSERT
, DELETE
, UPDATE
) to the migrated table.
Running two concurrent copy phases is, generally speaking, a very heavyweight operation and the two tasks interfere with each other. However, running two or more concurrent tailing phases could be lightweight, depending on incoming traffic.
Types of migrations that may run concurrnetly #
There are valid, even essential cases to running multiple migrations concurrently. Vitess supports the following scenarios:
- Even though a long running
ALTER
may be running, aCREATE
orDROP
can be issued concurrently, with little to no effect on the migration and without competing over resources. - There can be an urgent need to revert a migration. Vitess can allow reverting a migration (or even multiple migrations) even as some other unrelated migration is in process.
- Two
vitess
migrations could run concurrently:vitess
will make sure only a single copy-phase runs at a time, but as many (up to some limit, in the dozens) tail phases may run concurrently to each other. This plays well with postponed migrations.
Running a concurrent migration #
To run a migration concurrently, the user will add --allow-concurrent
to the ddl_strategy
. For example:
mysql> set @@ddl_strategy='vitess --allow-concurrent';
mysql> create table sample_table(id int primary key);
or, via vtctl
:
vtctldclient ApplySchema --ddl-strategy "vitess --allow-concurrent" -sql "REVERT VITESS_MIGRATION '3091ef2a_4b87_11ec_a827_0a43f95f28a3'"
Restrictions and eligibility #
- To be eligible for concurrent execution,
--allow-concurrent
must be supplied. - Any
CREATE
andDROP
DDL is eligible for concurrent execution. - Any
REVERT
request is eligible for concurrent execution. - There can be at most one non-concurrent (regular) migration running at any given time.
- There may be an unlimited number of concurrent migrations running at any given time, on top of potentially a single non-concurrent migration.
- But there will never be two migrations running concurrently that operate on the same table.
To clarify:
gh-ost
andpt-osc
ALTER
migrations are not eligible to run concurrently
Scheduling notes #
- Multiple migrations can be in
ready
state. The scheduler will check them one by one to see which is eligible to next run. - Migrations will advance to
running
state one at a time, at most a few seconds apart. - A migration can be blocked from
running
if it operates on the same table as an already running migration. - While one or more migrations can be blocked from
running
, other migrations, even if submitted later, could start running, assuming no concurrency conflicts.